Project Location
Florida
Project Category
Residential
-
Scope of Work
- Revit Architecture Modeling
- Revit Structure Modeling
- Revit MEP Modeling
- Navisworks Clash Detection & Coordination
- Architecture & Structure Sheet Preparation
- MEP Shop and Spool Preparation
Client
General Contractor
Team Size
10
Metropolitan Coral Square | Located in Florida
In brief, Project building comprises of 8 Story + Roof level. Ground level comprises of both residential units and common spaces, followed by level 2 onwards only residential units till level 8. Having total 12 different types of residential units making for total 204 units in the building, the approximate gross square footage of the building was 247,819 SF.
SERVICES OFFERED
Having a remarkable track record of successfully delivering coordination projects and sheet preparation scope, AEODC was brought on board to deliver the defined scope with quick turnaround at LOD 350 within a tight 8.0 to 10.0 week time-frame.
The scope of work included in the project:
- Revit Modeling: Creating detailed 3D models of the architecture, structure and MEP systems using Autodesk Revit software.
- Navisworks Clash Detection and Resolution: Utilizing Navisworks to identify and resolve clashes between various trades, ensuring smooth construction execution.
- Architecture & Structure Sheet Preparation: Generating accurate and comprehensive construction documents, including plans, elevations, sections, and details.
- MEP Shops: Preparation of Mechanical, Electrical and Plumbing Coordinated Shop Drawings
PROJECT CHALLENGES
The project presented several complex challenges, including:
- Tight Deadlines: The aggressive project timeline at site demanded efficient workflows, team coordination and rigorous project management.
- Interdisciplinary Coordination: Coordinating among multiple disciplines such as civil, architecture, structure, and MEP discipline required meticulous planning and communication.
- Model Complexity: The large scale and intricate design of the project necessitated robust BIM methodologies and advanced software tools.
STRATEGIES IMPLEMENTED
The strategies implemented for successfully delivering the project:
- Optimized Workflows: Leveraging advanced BIM tools and streamlined workflows to maximize productivity.
- Collaborative Approach: Fostering strong collaboration between the design and construction team to ensure timely issue resolution of critical RFI’s using project documentation software’s such as Procore.
- Quality Assurance: Implementing rigorous quality control measures to maintain accuracy and consistency throughout the project.
By successfully addressing these challenges, AEODC delivered a high-quality BIM project that facilitated efficient construction and minimized costly errors and delays in record time at site.
Explore More