  • Project Location

    Florida

  • Project Category

    Residential

  • Scope of Work

    • Revit Architecture Modeling
    • Revit Structure Modeling
    • Architecture & Structure Sheet Preparation
  • Client

    General Contractor

  • Team Size

    10

Aviara East | Located at Pompano Beach, Florida

In brief, Aviara East comprises of 3 buildings – an eight story residential building (271,000 SF), six story mixed use building (80,000 SF), and a single-story recreation building (10,000 SF). Residential Building has parking slots at ground floor followed by residential units on floors above, mixed use building has commercial space on ground floor followed by residential units on floors above.

SERVICES OFFERED

Having a remarkable track record of successfully delivering Revit architecture and structure modeling including sheet preparation scope, AEODC was brought on board to deliver the defined scope with quick turnaround at LOD 350 within a tight time-frame of 6.5 to 7.5 weeks.

The scope of work included in the project:

  • Revit Modeling: Creating detailed 3D models of the architectural and structural services using Autodesk Revit software.
  • Architecture & Structure Sheet Preparation: Generating accurate and comprehensive construction documents, including plans, elevations, sections, and details.

 

PROJECT CHALLENGES

The project presented several complex challenges, including:

  • Tight Deadlines: The project construction timeline demanded efficient workflows and rigorous project management.
  • Interdisciplinary Coordination: Coordinating among multiple disciplines such as civil, architecture and structure discipline required meticulous planning and communication.
  • Model Complexity: The large scale and intricate architecture design of the project necessitated robust BIM methodologies and advanced software tools.

 

STRATEGIES IMPLEMENTED

The strategies implemented for successfully delivering the project:

  • Optimized Workflows: Leveraging advanced Revit plug-ins and streamlined workflows to maximize productivity.
  • Collaborative Approach: Fostering strong collaboration between the design and construction team to ensure timely issue resolution of critical RFI’s using project documentation software’s such as Procore.
  • Quality Assurance: Implementing rigorous quality control measures to maintain accuracy and consistency throughout the project.

 

By successfully addressing these challenges, AEODC successfully delivered the defined scope within timeline that facilitated efficient construction by minimizing costly errors and delays in record time at site.

Explore More

  • Project Location

    Florida

  • Project Category

    Residential

  • Scope of Work

    • Revit Architecture Modeling
    • Revit Structure Modeling
    • Architecture & Structure Sheet Preparation
  • Client

    General Contractor

  • Project Duration

    6.5 to 7.5 Weeks

  • Team Size

    10