Project Location
Florida
Project Category
Mixed Use
-
Scope of Work
- Revit Architecture Modeling
- Revit Structure Modeling
- Revit MEP Modeling
- Navisworks Clash Detection & Coordination
- Architecture & Structure Sheet Preparation
Client
General Contractor
Team Size
8-10
Aventura Cross | Located in Florida
Aventura Cross, a prestigious mixed-use development in Miami, Florida, showcases modern design and engineering excellence. Spanning 449,000 square feet, the project combines residential spaces, retail areas, and a multi-level parking garage. A key highlight is the luxurious pool deck on Level 8, offering a perfect blend of relaxation and sophistication.
Comprehensive BIM modeling and coordination services were integral to the project’s success, ensuring seamless integration of architectural, structural, and MEP systems. This meticulous approach minimized conflicts, optimized construction workflows, and reinforced Aventura Cross’s status as a standout development in Miami’s urban landscape.
SERVICES OFFERED
Having a proven track record of successfully delivering revit modeling, coordination projects and sheet preparation scope, AEODC was brought on board to deliver the defined scope with quick turnaround at LOD 350 within a tight time-frame of 7.5 to 9.0 weeks.
The scope of work included in the project:
- Revit Modeling: Creating detailed 3D models of the architecture, structure and MEP systems using Autodesk Revit software.
- Clash Detection and Coordination: Utilizing Navisworks to identify and resolve clashes between various trades, ensuring smooth construction execution.
- ASMEP Sheet Preparation: Generating accurate and comprehensive construction documents, including plans, elevations, sections, and details.
PROJECT CHALLENGES
The project presented several complex challenges, including:
- Tight Deadlines: The accelerated project timeline demanded efficient workflows and rigorous project management.
- Interdisciplinary Coordination: Coordinating among multiple disciplines such as civil, architecture, structure, and MEP works required meticulous planning and communication.
- Model Complexity: The large scale and intricate design of the project necessitated robust BIM methodologies and advanced software tools.
STRATEGIES IMPLEMENTED
The strategies implemented for successfully delivering the project:
- Optimized Workflows: Leveraging advanced BIM tools and streamlined workflows to maximize productivity.
- Collaborative Approach: Fostering strong collaboration between the design and construction team to ensure timely issue resolution of critical RFI’s using project documentation software’s such as Procore.
- Quality Assurance: Implementing rigorous quality control measures to maintain accuracy and consistency throughout the project.
By successfully addressing these challenges, AEODC delivered a high-quality BIM project that facilitated efficient construction by minimizing costly errors and delays in record time at site.
Explore More